(1)Xiao Guo; Huijun Sun. Modeling the morning commute problem in a bottleneck model based on personal perception. Journal of Advanced Transportation. 2019,(2019): 6184827.(SCI) (2) Guo Xiao, sun Huijun. Research on heterogeneous travelers' early peak travel problem based on bottleneck network. System engineering theory and practice. 2018, 38 (4): 1003-1012. (EI Journal) (3)Guo Xiao, Sun Huijun. Analysis of time of day fare discounts on urban mass transit travel behavior, crowding and waiting time. Mathematical Problems in Engineering, 2014,2014: 686705.(SCI) (4)Guo Xiao, Sun Huijun. Reward and Coarse Toll in Competitive System with Two Modes. The 9th International Conference on Traffic and Transportation Studies.ICTTS 2014, 205-213, August 1-3, Shaoxing, China.(EI) (5)Mu Yun Dong, Guo Xiao. On-line Rescheduling to Minimize Makespan under a Limit on the Maximum Sequence Disruption.2009 IITA International Conference on Services Science, management and Engineering, 2009, 24:479-482.(EI) (6)Mu Yun Dong, Guo Xiao. On-Line Rescheduling to Minimize Makespan under a Limit on the Maximum Disruptions. 2009 International Conference on Management of e-Commerce and e-Government, 2009, 9: 141-144.(EI) (7)Mu Yun Dong, Guo Xiao, Yun Hao.Rescheduling to minimize total completion time under a limit sequence disruption of the parallel batching. 2010 International Conference on Future Information Technology and computing, 2010, 12: 33-37. (8)Mu Yun Dong, Guo Xiao, Hao Yun.Rescheduling to minimize total completion time under a limit time disruption of the parallel batching. 2010 International Conference on Future Information Technology and computing, 2010, 12: 29-32. (9)XuXiao Yan, Mu Yundong, Guo Xiao, Hao Yun.Rescheduling to minimize total completion time under a limit time disruption for the parallel batch.Chinese Quarterly Journal of Mathematics, 2015, 30(2): 274-279.(中文核心) (10) Guo Xiao, Feng Miluo, Mu Mo mo. sequential batch reordering to minimize the total completion time under the limitation of time dislocation. Journal of Zhengzhou University (SCIENCE EDITION), 2012, 44 (1): 42-45. (Chinese core) (11) Mu Mo, PI Junde, Guo Xiao. Sequential batch reordering with minimizing the sum of completion times under sequence dislocation constraints. University mathematics, 2012, 28 (4): 68-71 |